H.000471.6 US 190 Livingston Parish

Livingston Parish
GCC Job: 
1174-
 
Project Details:
This project consists of milling, patching, and overlaying 11 miles of US 190 from the town of Livingston to the Livingston Parish/Tangipahoa Parish line. The project includes over 30,000 tons of asphalt, and it also includes upgrades to the shoulders with cement treated base and asphalt, as well as new aprons and guardrail at each of the six bridge locations.